Customization: | Available |
---|---|
After-sales Service: | YES |
Warranty: | 1 year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Overall split design. The main engine is a tugboat structure, which can be separated for loading and unloading, which can not only meet the transportation requirements, but also realize the convenient location on the construction site. The outer shape of the power station operation room is a 20-foot container, which is convenient for container transfer and transportation.
2. Powerful power system. Two 565-kW, one 264-kW, and one 154-kW engines are composed together. Through the plc control system, it not only guarantees strong power, but also energy saving and environmental protection.
3. Patented power head active protection system, multiple protection rotary push-pull motor, completely resist the impact of various working conditions on the motor, and extend the service life of the motor.
4. Adaptive automatic drilling system. Torque and rotation speed push-pull force and push-pull speed can be set through the plc control system.
5. Large rotary manipulator. Patented technology, the performance of the cylinder rack rotary manipulator is stable.
Metric Unit | Imperial Unit | |
Rig Weight | 81000kg | 178661lbs |
Rig Dimension (LxWxH) | 22300×2800×39500mm | 878×110.2×1555in |
Power station weight | 18000kg | 39683 lbs |
Operating room Dimension | 6050×2500×2600 mm | 238.2×94.5×102.4 in |
Operating room Weight | 3000kg | 6614 lbs |
Operating room Dimension | 6050×2500×2600 mm | 238.2×94.5×102.4 in |
Max.Thrust&Pullback force | 12000kN | 2690000 lbs |
Max.Thrust&Pullback Speed | 40 m/min | 40 m/min |
Max. Torque | 260000 N·m | 191199 lbs·ft |
Max.Rotation Speed | 85 r/min | 85 r/min |
Engine power | 565 kW×2+264kW | 1872 hp |
Maximum working pressure | 35 MPa | 5076 psi |
Max.Clamp Force | 5300 kN | 1190000 lbs |
Max Unscrewing Torque | 720000 N·m | 531834 lbs·ft |
Main Spindle Floating Distance | 140 mm | 5.5 in |
Mud channel diameter | 4 in | 4 in |
Entry Angle | 8-18° | 8-18° |
Drill Rod Size | Φ168-Φ254 mm | 6.61-10 in |
Crane Capacity | 8 t | 8.8 short ton |
Suggest Reaming Diameter | ≤ Φ2000 mm | 78.74 in |
Suggest Crossing Length | ≤3000 m | 9842.5ft |
Goodeng Machine was established in 2002. The company has production bases locating in China and Thailand and 2 overseas branch offices locating in Malaysia and India, covering a total area around 200,000 square meters.
The main products include GS series horizontal directional drilling rigs, GPY series static hydraulic piling rigs, GM series open-pit surface drilling rigs and drilling tools. Annual sales exceed 3,000 units.
We have offices and professional after-sales service teams in many countries. We will provide you with engineering training, installation and commissioning services.We can aslo provide the complete solution for engineering construction.
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.