Goodneg 160tons gas pipeline drilling rig

Product Details
Customization: Available
After-sales Service: Global Service Team
Warranty: 12 months
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
104
Year of Establishment
2011-08-10
  • Goodneg 160tons gas pipeline drilling rig
  • Goodneg 160tons gas pipeline drilling rig
  • Goodneg 160tons gas pipeline drilling rig
  • Goodneg 160tons gas pipeline drilling rig
  • Goodneg 160tons gas pipeline drilling rig
  • Goodneg 160tons gas pipeline drilling rig
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Project Site
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
GS1600-LS
Certification
ISO 9001:2008
Condition
New
Drill Hole Diameter
<1450mm
Drill Hole Depth
10-30m
Bit Type
Drag Bit
Drilling Way
Rotary
Type
Crawler
Engine Power
316 kW
Max. Torque
61000 N·m
Max. Push&Pull Force
1800 kN
Max. Mud Pump Flow
800 L/Min
Transport Package
Nude Packing
Specification
11080*2600*3000 mm
Trademark
Goodeng
Origin
China
HS Code
843041
Production Capacity
2200/Year

Product Description

 

Goodneg 160tons gas pipeline drilling rig

Product Parameters

 
Rig Weight 25000kg Dimension(L×W×H) 11080×2600×3000mm
Max. Thrust & Pullback Force 1800kN Max. Thrust & Pullback Speed 45m/min
Max. Torque  61000N·m Max. Rotation Speed 115r/min
Engine Power 316kW Max. Mud Flow 800L/min
Walking Speed 3-5km/h Max. Mud Pressure 10MPa
Entry Angle 10°-20° Max. Climbing Gradient 18°
Suggest Reaming Diameter Ф1450mm Suggest Crossing Length 1100m
Drill Rod Size Ф114-Ф127×6000mm Crane Capacity 3 tons

Detailed Photos

Goodneg 160tons gas pipeline drilling rig
Goodneg 160tons gas pipeline drilling rig
Goodneg 160tons gas pipeline drilling rig

 

 

Project Site

Goodneg 160tons gas pipeline drilling rig

Company Profile

Goodneg 160tons gas pipeline drilling rigGoodneg 160tons gas pipeline drilling rig

FAQ

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours, whichever occurs first.

2. What about the delivery time?

    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?

    A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.

       On L/C term, 100% irrevocable L/C without "soft clause" can be accepted. 

4.What logistics ways we can work for shipment?

    A: We can ship machine by sea and road. 

 5. What about the after-sales service?

   A: We have office and professional after-sales service team in many countries. After you receive the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier