Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility

Product Details
Customization: Available
After-sales Service: YES
Warranty: 1 year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
104
Year of Establishment
2011-08-10
  • Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
  • Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
  • Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
  • Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
  • Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
  • Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
  • Overview
  • Product Parameters
  • Detailed Photos
  • Company Profile
  • Certifications
  • Exhibition
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
GS1600-LS
Certification
RoHS, ISO 9001:2000, ISO 9001:2008
Condition
New
Drill Hole Diameter
>300mm
Drill Hole Depth
10-30m
Bit Type
Drag Bit
Drilling Way
Rotary
Type
Crawler
Transport Package
Flat Rack Container
Specification
11000mm*2700mm*3300mm
Trademark
GOODENG
Origin
China
HS Code
84304900
Production Capacity
3000 Set/Year

Product Description

1. The Cummins turbocharged engine provides robust power and reliable performance, while also offering a lower fuel consumption rate compared to other engines.

2. The pushing and pulling device is equipped with German Rexroth/Sunny motors, which feature a straightforward transmission structure, dependable performance, and multi-stage variable speed capabilities. This allows for pushing and pulling forces of up to

1500kN, industry-leading efficiency and speed;

3. The rotary device is equipped with a German Rexroth motor, enabling rotary multi-step variable speed, which greatly improves the working efficiency; 5 km/h, no loading required for short-distance transfer.

4. The low center of clamp not only protects the drill pipe efficiently, but also occupies less space for construction. The front and rear clamps can be separated and replaced according to the specifications of the drill pipe.

The front and rear clamps can be separated, and the corresponding clamping block can be replaced according to the specifications of the drill pipe.

5. The main shaft is floating, which is conducive to the protection of the drill pipe screws. 10°~19°, the low center of gravity of the drilling rig ensures excellent stability.

6,The wire-controlled traveling system guarantees the safety of both equipment and personnel, and the drilling rig is highly convenient for traveling, transferring, and loading/unloading trucks.

7,The Gudeng patented rotary manipulator allows the drill pipe to slide down automatically. The pipe does not need to be unloaded manually, which saves on labor costs.

8. The vehicle-mounted operation room is spacious and rotatable, and is equipped with cold and warm air conditioning.

 

Product Parameters
  Metric Unit Imperial Unit
Weight 25000 kg 55126 lb
Max.Thrust&Pullback Force  1800 KN 400352 lbf
Max.Torque  61000 N·m 44252 lbf·ft
Engine Power  316 kW 422 hp
Walking Speed  3-5 km/h 1.86-3.11 mph
Entry Angle 10°-20° 10°-20°
Drill Rod Size Φ114/127×6000 mm 4.49/5.00×236.22 in
Suggest Reaming Diameter ≤ Φ1450 mm 57.09 in
Dimension (LxWxH) 11080×2600×3000 mm 36.4×102.4×118.1 ft
Max.Thrust&Pullback Speed  45 m/min 147.6 ft/min
Max.Rotation Speed  115 r/min  115 r/min
Max.Flow of Mud Pump  800 L/min 21.13 gpm
Max.Mud Pump Pressure  10 MPa 1450 psi
Max.Climbing Gradient 18° 18°
Crane Capacity 3 Metric Tons 3.31 Short Tons
Suggest Crossing Length ≤1100m 3609 ft
Detailed Photos
Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
Company Profile

Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline UtilityGoodeng Machine was established in 2002. The company has production bases locating in China and Thailand and 2 overseas branch offices locating in Malaysia and India, covering a total area around 200,000 square meters.

The main products include GS series horizontal directional drilling rigs, GPY series static hydraulic piling rigs, GM series open-pit surface drilling rigs and drilling tools. Annual sales exceed 3,000 units.

We have offices and professional after-sales service teams in many countries. We will provide you with engineering training, installation and commissioning services.We can aslo provide the complete solution for engineering construction.

Certifications

Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility

Exhibition

Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility

 
 
 
 

 





 
Packaging & Shipping
Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
Goodeng GS1600-LS (160Ton)Trenchless HDD machine/Underground Pipeline Utility
FAQ


1. What about the warranty time?

A:12 months after shipment or 2000 working hours,whichever occurs first.

2. What about the delivery time?

A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?

A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.

On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.

4.What logistics ways we can work for shipment?

A: We can ship machine by sea and road.

5. What about the after-sales service?

A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

   A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier