Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects

Product Details
Customization: Available
After-sales Service: provided
Warranty: provided
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
104
Year of Establishment
2011-08-10
  • Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
  • Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
  • Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
  • Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
  • Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Find Similar Products
  • Overview
  • Product Parameters
  • Product Description
  • Detailed Photos
  • Certifications
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
GS3000-LS
Certification
ISO 9001:2000, ISO 9001:2008
Condition
New
Drill Hole Diameter
1800mm
Drill Hole Depth
2000m
Bit Type
Drag Bit
Drilling Way
Rotary
Type
Crawler
Engine Power
264 kW*2
Max Torque
100000 Nm
Max. Push&Pull Force
3000 kN
drill rod
9600mm
Transport Package
Nude Packing
Specification
18260*3200*3600 mm
Trademark
Goodeng
Origin
China
HS Code
8430
Production Capacity
2000/Year

Product Description

Product Parameters
Rig Weight 52000 kg Dimension(L×W×H) 18500×3500×3600mm
Max. Thrust & Pullback Force 3000KN Max. Thrust & Pullback  Speed 35m/min
Max. Torque 100000N·m Max. Rotation Speed 95r/min
Engine Power 2×264kW  Walking Speed 3-5Km/h
Entry Drill Angle 9°-22° Max. Climbing Gradient 18°
Drill Rod Size Φ140/Φ168×9600mm Crane capacity 3T
Suggest Reaming Diameter ≤ Φ1800mm (Soil depended) Max. Drilling Length ≤ 2000 m
(Soil depended)
Product Description

1. Hydraulic system: push-pull, rotation, walking adopts closed system, electro-hydraulic proportional control;
2. Equipped with dual power system to meet the needs of different working conditions, it can flexibly realize dual-machine work or single-machine work, saving energy and reducing energy consumption; when one hydraulic system or engine fails, the other system can work normally (the power remains unchanged, The speed is slowed down), which greatly improves the safety of construction;
3. The front and rear clamps can be separated, and the clamps are floating throughout;
4. The main shaft is floating, which is beneficial to protect the drill pipe thread;
5. Floating girder is conducive to climbing and transportation, and it is also easy to adjust the incident angle;
6. Proportional wire-controlled walking system to ensure human-machine safety during walking, loading and unloading;
7. Electric control handle, simple circuit, safe and reliable, high sensitivity;
8. The vehicle cab has a large space and an adjustable seat, which is more humane and more comfortable;
9. In order to improve the operation capacity of the equipment, the hydraulic system adopts a large flow and high pressure design, and is equipped with a cartridge control valve group independently designed by Goodeng Machinery. The system responds quickly and the system pressure loss can be reduced by about 50%;
10. The self-designed and developed electro-hydraulic joint control system realizes the self-adaptive control of the main engine for different working conditions and different geology, which can improve the construction efficiency of the main engine by about 30%; the system has two modes of automatic operation and manual operation; automatic operation state In order to protect the safety of the drilling rig, adjust the operating parameters of the drilling rig in time according to the geological conditions, and realize the automatic adjustment of the drilling rig;
11. The LCD human-computer interaction system can adjust the working and alarm parameters of the equipment at any time, and monitor the status of the equipment in real time, making the operation easier and more comfortable;
12. Reasonable and effective flushing and cooling system ensures the reliability and efficiency of system operation; avoids motor damage and prolongs service life.

 

Detailed Photos
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Certifications

 

Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Company Profile
 
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects
Advanced 300 Ton Horizontal Directional Drill Rig for Oil and Gas Projects

                      Goodeng-China                                                    Goodeng-Malaysia                                        Goodeng-Surface Drilling Machine                                                      

FAQ

1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:10-20 days after receiving the deposit.
3.What kind terms of payment can be accepted?        
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be paid before shipment, or against the copy of original BL for old client.      
B: On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?  
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier