GOODENG Hydraulic Static Pile Driver for Construction Projects

Product Details
Customization: Available
After-sales Service: YES
Warranty: 1 YEAR
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
104
Year of Establishment
2011-08-10
  • GOODENG Hydraulic Static Pile Driver for Construction Projects
  • GOODENG Hydraulic Static Pile Driver for Construction Projects
  • GOODENG Hydraulic Static Pile Driver for Construction Projects
  • GOODENG Hydraulic Static Pile Driver for Construction Projects
  • GOODENG Hydraulic Static Pile Driver for Construction Projects
  • GOODENG Hydraulic Static Pile Driver for Construction Projects
  • Overview
  • Product Parameters
  • Product Description
  • Detailed Photos
  • Company Profile
  • Project Cases
  • Exhibition
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
GPY158
Type
Pressure Pile Driver
Pressure Pile Driver Type
Mechanical Pile Driver
Pile Hammer Type
Drilling tool
Power Source
Electric
Motor Power
Drilling tool
Noise
Without Noise
Certification
EPA, ISO 9001:2000
Condition
New
Min. Square Piling
150mm
Max. Sqare Pling
300mm
Min. Round Piling
200
Max. Round Piling
400
Side Piling Space
0.3m
Corner Piling Space
1.53
Transport Package
Track
Specification
16200mm*9200mm*3300mm
Trademark
Goodeng
Origin
China
HS Code
843041
Production Capacity
500/Year

Product Description

 
Product Parameters
 
Name Unit Specification
Machine weight t 58
Total weight of counterweight iron t 100
Total weight of equipment t 158
Working dimension(L×W) m /
Transportation dimensions(L×W×H) m 8×2.2×2.7
Long bridge dimensions(L×W) m 8.0×0.9
Short bridge dimensions(L×W) m 2.7×2.2
Max.piling force tf 158
Max.piling speed m/min 11.5
Piling stroke per time m 1.5
Max.longitudinal stroke per time m 1.8
Max.horizontal stroke per time m 0.5
Max.rotary angle per time ° 15°
Hydraulic system rated pressure MPa 22.5(16)
Effective hoisting pile length m 12
Min.side piling space mm 400
Min.corner piling space mm 1200
Max.loading pressure tf/m² 10.4/12.6
Product Description

1. High-efficiency and energy-saving constant power hydraulic system.
2. The pile cylinder and motor pump unit are accurately matched and combined.
3. The pile cylinder returns quickly, reducing the time for lifting the pile clamping box, making the construction faster and improving the efficiency of pile pressing.
4. Scientific hydraulic pipeline layout can greatly reduce pipeline losses, hydraulic system losses, and save energy.
5. A static pile driver can be used directly to conduct static load tests on piles.
6. The whole machine is easy to disassemble and assemble, and its modular design makes it easy to transport.
7. The hydraulic cylinder walking has automatic reset and rotation compensation functions. The whole machine has a small grounding specific pressure and is suitable for more sites.
8.  Add counterweights (optional) on both sides to lower the center of gravity of the entire machine and make construction safer.

 
Detailed Photos
 
GOODENG Hydraulic Static Pile Driver for Construction Projects
GOODENG Hydraulic Static Pile Driver for Construction Projects
GOODENG Hydraulic Static Pile Driver for Construction Projects
 
Company Profile
GOODENG Hydraulic Static Pile Driver for Construction Projects
Goodeng Machine was established in 2002. The company has 2 domestic production bases and 2 overseas bases located in Malaysia and Thailand, covering a total area of 150,000 square meters.
The main products include GS series horizontal directional drilling rigs, GPY series static pile drilling rigs, GM series open-pit rock drilling rigs and supporting drilling tools. Annual sales exceed 3,000 units.
We have offices and professional after-sales service teams in many countries. After receiving your new machine, we will provide you with 3-5 days of engineering training, installation and commissioning services. If you have any questions, our after-sales service team will arrive at the project site in the shortest time.
Project Cases

GOODENG Hydraulic Static Pile Driver for Construction Projects

Exhibition

GOODENG Hydraulic Static Pile Driver for Construction Projects

Certifications

GOODENG Hydraulic Static Pile Driver for Construction Projects

FAQ

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours,whichever occurs first.

2. What about the delivery time?
    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?
    A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
      On L/C term, 100% irrevocable L/C without"soft clause" can be accepted. 

4.What logistics ways we can work for shipment?
    A:We can ship machine by sea and road. 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier