Name |
Unit |
Specification |
Machine weight |
t |
58 |
Total weight of counterweight iron |
t |
100 |
Total weight of equipment |
t |
158 |
Working dimension(L×W) |
m |
/ |
Transportation dimensions(L×W×H) |
m |
8×2.2×2.7 |
Long bridge dimensions(L×W) |
m |
8.0×0.9 |
Short bridge dimensions(L×W) |
m |
2.7×2.2 |
Max.piling force |
tf |
158 |
Max.piling speed |
m/min |
11.5 |
Piling stroke per time |
m |
1.5 |
Max.longitudinal stroke per time |
m |
1.8 |
Max.horizontal stroke per time |
m |
0.5 |
Max.rotary angle per time |
° |
15° |
Hydraulic system rated pressure |
MPa |
22.5(16) |
Effective hoisting pile length |
m |
12 |
Min.side piling space |
mm |
400 |
Min.corner piling space |
mm |
1200 |
Max.loading pressure |
tf/m² |
10.4/12.6 |
1. High-efficiency and energy-saving constant power hydraulic system.
2. The pile cylinder and motor pump unit are accurately matched and combined.
3. The pile cylinder returns quickly, reducing the time for lifting the pile clamping box, making the construction faster and improving the efficiency of pile pressing.
4. Scientific hydraulic pipeline layout can greatly reduce pipeline losses, hydraulic system losses, and save energy.
5. A static pile driver can be used directly to conduct static load tests on piles.
6. The whole machine is easy to disassemble and assemble, and its modular design makes it easy to transport.
7. The hydraulic cylinder walking has automatic reset and rotation compensation functions. The whole machine has a small grounding specific pressure and is suitable for more sites.
8. Add counterweights (optional) on both sides to lower the center of gravity of the entire machine and make construction safer.
Company Profile
Goodeng Machine was established in 2002. The company has 2 domestic production bases and 2 overseas bases located in Malaysia and Thailand, covering a total area of 150,000 square meters.
The main products include GS series horizontal directional drilling rigs, GPY series static pile drilling rigs, GM series open-pit rock drilling rigs and supporting drilling tools. Annual sales exceed 3,000 units.
We have offices and professional after-sales service teams in many countries. After receiving your new machine, we will provide you with 3-5 days of engineering training, installation and commissioning services. If you have any questions, our after-sales service team will arrive at the project site in the shortest time.
Project Cases

Exhibition

Certifications

FAQ
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without"soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A:We can ship machine by sea and road.