Customization: | Available |
---|---|
After-sales Service: | YES |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hole diameter | φ90-152mm | 3.5-6 in | |
DTH hammer | 3 in/4 in/5 in | ||
Rod changing system | Drill rod storage | 6+1 | |
Drill rod diameter | 89 mm | 3.5 in | |
Drill rod length | 4 m | 13 ft | |
Max. Hole depth | 28 m | 92 ft | |
Hydraulic rotation head | Rotation speed | 0-115 rpm | |
Drilling torque | 2040N·m | 1505 ft·lbs | |
Max. Rotation torque | 3500N·m | 2581 ft·lbs | |
Engine | Rated power | 264 KW/1800 rpm | 354 hp |
Fuel tank | 550 L | 145 gal | |
Two-stage air compressor | Max. Working pressure | 21 bar | 306 psi |
Max. displacement | 20 m³/ min | 706 ft ³/min | |
Drill boom type | High strength single straight boom | ||
High strength steel feed beam Chain motor type |
Total length | 7132 mm | 23 ft |
Travel length | 4500 mm | 15 ft | |
Feed extension | 1400 mm | 4.6 ft | |
Max. Feed rate | 0.93 m/s | 3.05 ft/s | |
Max. Feed force | 30 kN | 6745 lbf | |
Max Tractive pull | 40 kN | 8993 lbf | |
Adjustable flat chssis | Traveling speed | 1.5/3 km/h | 0.93/1.86 mph |
Max. Traction force | 120 k N | 26979 lbs | |
Gradient | 25° | ||
Track oscillation | ±10° | ||
Ground clearance | 420 mm | 16.54 in | |
Transportation Condition | Weight | 16000 kg | 35274 lbs |
Size(L*W*H) | 9700*2400*3500mm | 31.82 ft* 7.87 ft*11.48 ft |
This is a large-diameter drilling machine series featuring superior drilling ability. Mobility in small faces, the comfort of the cabin, ease of operation, and ease of maintenance have all been greatly improved. The hard work of drilling can be made easily and in a comfortable cabin.
1. Cummins Engine QSL8.9-C360 Power 264 kW
2. Two-stage air compressor 20m³/min 21bar
3. Automatic rod changing system
4. Dry dust collector with automatic filter cleaning
5. High strength steel feed beam
6. Dual speed hydraulic traveling motor
7. Electric fuel refueling pump
8. Air-conditioned cab
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or
against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without"soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.