Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | Provided |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
I. Main Technical Parameter
Machine Weight | 45T | Transportation Dimensions (L×W×H) | 9.0m*3.4m*3.6m |
Total weight of equipment | 188T | Working dimensions(L×W) | 9.0×3.4m |
Total weight of F-Type counterweight iron | 145T | Long bridge dismensions | 3.4×1.3m |
Max. piling force | 188T | Short bridge dismensions | 3.79×1.0m |
Max. piling speed | 7.54m/min | Piling stroke per time | 1.2m |
Max. longitudinal stroke per time | 1.0m | Max. horizontal stroke per time | 0.4m |
Max. rotary angle per tim | +90°- -90° | Hydraulic system rated pressure | 30(18)Mpa |
Effective hoisting pile length | 12m | Min. side piling space | 1100mm |
Max.lodsing pressure | 24/19.3 tf/m² | ||
Piling Size | Square200~400 / circle300~500 |
1) High-efficiency and energy-saving constant power hydraulic system.
2) The pile driving cylinder and motor pump unit are accurately matched and combined.
3) The pile pressing cylinder returns quickly, which reduces the time of lifting the pile clamping box, and the construction speed is fast, which improves the efficiency of pile pressing.
4) Scientific hydraulic pipeline layout can greatly reduce pipeline losses, reduce hydraulic system losses, and save energy.
5) A static pressure pile driver can be used directly to conduct static load tests on piles.
6) The whole machine is easy to disassemble and assemble, and its modular design makes it easy to transport.
7) The hydraulic cylinder walks in a walking style and has automatic reset and rotation compensation functions. The whole machine has a small grounding specific pressure and is suitable for more sites.
8) Adding counterweights on both sides (optional) lowers the center of gravity of the entire machine and makes construction safer.
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or
against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without"soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.