Customization: | Available |
---|---|
After-sales Service: | provided |
Warranty: | provided |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
· Steel track with rubber plate attached, wire controlled walking, adjustable speed in two levels
· Push pull speed adjustable in three levels (high speed, medium speed, low speed)
· Large beam sliding amplitude mechanism
· Reserved power boost for power head
· Configure a rotating robotic arm
· Optional automatic rod feeding mechanism and automatic hydraulic anchor
Rig Weight | 60000 kg |
Power Control Room Weight | 5200 kg |
Operation Room Weight | 3000 kg |
Max. Thrust & Pullback Force | 6000 kN |
Rated Torque | 180000 N.m |
Rated Power | 700 kW |
Entry Angle | 6.5° - 16° |
Drill Rod Diameter | Φ168-Φ194 mm |
Suggest Reaming Dia. | ≤ Φ2000 mm |
Rig Dimension (L×W×H) | 19700×3100×3250 mm |
Power Control Room Dimension Size(L×W×H) | 6050×2450×2600 mm |
Operation Room Dimension Size (L×W×H) | 6050×2450×2600 mm |
Max. Thrust & Pullback Speed | 32 m/min |
Max. Rotation Speed | 91 r/min |
Travel Distance of Carriage | 11.5 m |
Crane Capacity | 5 t |
Drill Rod length | 9600 mm |
Suggest Crossing Length | ≤ 2500 m |
1. What about the warranty time?
A:12 months after shipment or 2000 working h ours,whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries.
After you receive the new machine, we will provide you one engineering training installation and debugging service for 3-5days.
If there are some problems, our after-sales service personnels will arrive the project site in shortest time.