Advanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile Driving

Product Details
Customization: Available
After-sales Service: 24 HOURS
Warranty: 1 YEAR OR 2000 HOURS
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
104
Year of Establishment
2011-08-10
  • Advanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile Driving
  • Advanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile Driving
  • Advanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile Driving
  • Advanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile Driving
Find Similar Products
  • Overview
  • Product Parameters
  • Product Description
  • Detailed Photos
  • Company Profile
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
GYP368
Type
Pressure Pile Driver
Pressure Pile Driver Type
Hydraulic Pile Driver
Pile Hammer Type
Hydraulic Hammer
Power Source
Electric
Motor Power
55kw
Noise
Without Noise
Certification
ISO 9001:2008
Condition
New
Transport Package
Naked
Specification
14.05*3.2*3.0 m
Trademark
Goodeng
Origin
China
HS Code
8501400000
Production Capacity
2000 Set/Per Year

Product Description

Product Parameters
 
 
Machine Weight 115 T Transportation Dimensions (L×W×H) 14.05×3.2×3.0 m
Total weight of counterweight iron 128 T Working dimensions
(L×H)
14.05×6.6
Max. piling force 368 tf Long bridge dimensions (L×H) 12×1.2 m
Max. piling speed 7.5 m/min Short bridge dimensions (L×H) 4.2×3.2 m
Max. longitudinal stroke per time 3m Piling stroke per time 1.6 m
Max. rotary angle per time 11° Max. horizontal stroke per time 0.6 m
Effective hoisting pile length 14(15) m Hydraulic system rated pressure 26(16) MPa
Max. loading pressure 12.9/14.7 tf/m² Min. side piling space 1200 mm
Piling Size Ф200-Ф500mm
F200-F500mm
Min.Corner piling space 1800 mm
 
Product Description

 

1) High-efficiency and energy-saving constant power hydraulic system.
2) The pile cylinder and motor pump unit are accurately matched and combined.
3) The pile cylinder returns quickly, reducing the time for lifting the pile clamping box, making the construction faster and improving the efficiency of pile pressing.
4) Scientific hydraulic pipeline layout can greatly reduce pipeline losses, hydraulic system losses, and save energy.
5) A static pile driver can be used directly to conduct static load tests on piles.
6) The whole machine is easy to disassemble and assemble, and its modular design makes it easy to transport.
7) The hydraulic cylinder walking has automatic reset and rotation compensation functions. The whole machine has a small grounding specific pressure and is suitable for more sites.
8) Add counterweights (optional) on both sides to lower the center of gravity of the entire machine and make construction safer.

 
Detailed Photos

 

Advanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile DrivingAdvanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile DrivingAdvanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile DrivingAdvanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile Driving  
Company Profile

"Goodeng Machine" was established in May 2002, is a national high-tech enterprise engaged in R&D, production, sales and service of trenchless machinery, piling machinery, mining machinery, the main products are GS series of horizontal directional drilling machine, GPY series of static pile driver, GM series of surface drilling machine and accessories.
 

After Sales Service

 

Advanced Static Hydraulic Piling Driver GPY368 for Fast and Accurate Pile Driving
FAQ

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours,whichever occurs first.

2. What about the delivery time?
    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?
    A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
      On L/C term, 100% irrevocable L/C without"soft clause" can be accepted. 

4.What logistics ways we can work for shipment?
    A:We can ship machine by sea and road. 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier