Product Parameters
Rig Weight |
4700 kg |
Dimension(L*W*H) |
7300*2230*2310(mm) |
Max. Push&Pull Force |
150 kN |
Max. Torque |
14000 N·m |
Max. Push&Pull Speed |
46m/min |
Max. Rotation Speed |
193 r/min |
Engine Power |
93 kW |
Max. Mud Pump Flow |
180 L/min |
Walking Speed |
2.5-4.0(km/h) |
Max. Mud Pump Pressure |
8 Mpa |
Entry Drill Angle |
12°-22° |
Max. Climbing Gradient |
17° |
Suggest Reaming Diameter |
ø700mm(Soil Depended) |
Suggest Crossing length |
200m(Soil Depended) |
Product Description
- The machine is equipped with Cummins engine, with high efficiency, large power and low fuel consumption.
- The thrust & pullback and rotation of the power head adopt American Eaton orbit motor, and the construction speed is far ahead in the same industry.
- The thrust & pullback and rotation adopt hydraulic control handle, which is simple and fast to operate.
- Humanized design of console: the seat can move back and forth, which improves the comfort of operators.
- The outer cover and console are designed in iron streamline shape, with beautiful and generous appearance. The cover is equipped with hinged door, which can be opened, and the operation is flexible, which is convenient for daily maintenance and maintenance;
- The drilling rig is small in shape and light in weight. It is suitable for urban construction, transportation and transfer. It is flexible and convenient.
- It can be equipped with Ф60×2000mm drill rod according to construction situation;
- Main hydraulic components are from the international first-class hydraulic component manufacturer, which greatly improve the reliability of the product performance and safety.
- Rack and pinion system is adopted for thrust &pullback, which is good for high efficiency, long life, stable working and convenient maintenance.
Detailed Photos
Certifications
Company Profile
Goodeng-China
Goodeng-Malaysia Goodeng-Thailand
Packaging & Shipping
After Sales Service
FAQ
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:10-20 days after receiving the deposit. 3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client. On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment? A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.