Product Parameters
Rig Weight |
9800 kg |
Dimension(L*W*H) |
7300*2230*2310(mm) |
Max. Push&Pull Force |
380/760 kN |
Max. Torque |
14000 N·m |
Max. Push&Pull Speed |
36 m/min |
Max. Rotation Speed |
135 r/min |
Engine Power |
153 kW |
Max. Mud Pump Flow |
400 L/min |
Walking Speed |
2.5-4.0(km/h) |
Max. Mud Pump Pressure |
8 Mpa |
Entry Drill Angle |
13°-23° |
Max. Climbing Gradient |
18° |
Suggest Reaming Diameter |
ø1000mm(Soil Depended) |
Suggest Crossing length |
450m(Soil Depended) |
Product Description
1. The machine is equipped with Cum-ins engine with high efficiency, large power, low fuel consumption, low noise, and strong ability in construction.
2. It is equipped with hydraulic gear pump used mili--ary technology. Thrust & pullback and rotation hydraulic system adopt advanced series of parallel control technology and the international first-class hydraulic components with high efficiency, low consumption and high stability.
3. The machine is equipped with rotation and thrust & pullback pilot control, and the operation is more portable.
4. The power head rotation is driven by the American high-torque Eaton motor, which is stable in performance and achieves infinitely variable speed. Thrust & pullback adopts American Eaton motor and three gears speed regulation.
5. Driving head reserves reinforced power - thrust & pullback force, which expands the scope of drilling construction, and makes it convenient for emergency project.
6. It is equipped with first-class walking hydraulic driving device. Steel track walking is driven by wire-control, which is convenient for loading & unloading and transferring.
7. Operation table adopts man-machine construction manner, which is comfortable for operation, and can greatly reduce workers fatigue level. The rotating cab is optional, with AC, broad vision, and comfortable seat.
8. Equipped with Ф73×3000 mm or Ф76×3000mm or Ф83×3000mm drill rod, the machine contains medium field area, meeting the requirement for high efficiency construction in small place.
Detailed Photos
Certifications
Company Profile
Goodeng-China
Goodeng-Malaysia Goodeng-Thailand
Packaging & Shipping
FAQ
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:10-20 days after receiving the deposit. 3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client. On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment? A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.