Customization: | Available |
---|---|
After-sales Service: | provided |
Warranty: | provided |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Engine power |
221KW |
Dimension(L×w×h mm) |
8700×2400×2700 |
Rig weight: |
16700kg |
Max. torque |
35000N·m |
Max. Thrust & pullback force |
910/1360KN |
Max. rotation speed |
120r/min |
Max. Thrust & pullback speed: |
55m/min |
Max mud pump pressure |
10Mpa |
Entry drill angle |
12~20° |
Max mud pump flow |
600/800L/min |
Drill rod size | 102*4500 | crane capacity | 2t |
Max walking speed |
3-5Km/h |
Max. climbing gradient |
18° |
Suggest Reaming dia. |
1400mm (Soil depended) |
Suggest. construction distance |
900m(soil depended) |
1. The rotary system adopts German Linde liquid controlled closed system pump, which is efficient, stable and reliable. Thrust & pullback adopts Sunny automatic variable system and load sensitive control. The Rexroth motor is used for rotation and the high-pressure plunger motor is used for thrust & pullback. The working efficiency of the traditional hydraulic system is increased by more than 20%, and the heating capacity of the system is reduced, which can save 20% energy.
2. The thrust & pullback and rotating joystick adopts hydraulic control mode, which reduces the operation fault. The system is more stable and responsive.
3. Equipped with Weichai engine with strong power, stable performance and lower fuel consumption than other engines;
4. Maximum thrust & pullback force on carriage can be reinforced up to 910 kN, which provides the support for large construction.
5. The four-link amplitude modulation beam structure is adopted to greatly improve the range of incident angle, and to ensure that the track of drilling rig does not leave the ground when the angle is large, and to improve the safety performance.
6. Proportional line control walking system that ensures the safety of rig and personnel in process of walking, loading and uploading.
7. The loading and offloading drill pipe adopts the turning angle adjustable mechanical arm mechanism, the loading and offloading drill pipe is convenient and quick, which greatly reduces the construction personnel labor intensity and enhances the work efficiency.
8. Applicable for Ф102×4500 mm drill pipe, the machine fits moderate field area and is easy for jobsite transfer.
9. The main components are international first-class hydraulic components, which greatly improve the quality, performance and reliability of the products.
10. The circuit adopts wire harness design, which ensures the low failure rate and easy maintenance.
11. Thrust & pullback adopts rack & pinion model, which ensures high efficiency, stable work, and convenient maintenance.
12. Steel track with rubber plate can be loaded heavily and walks on all kinds of roads. It's convenient for urban transportation.
13. Equipped with rotating manipulator to achieve automatic upper and lower rod, safe and efficient.
14. Optional rotating cab with wide field of vision, which greatly improve the construction environment of the main operator.
"Goodeng Machine" is a national high-tech enterprise engaged in R&D, production, sales and service of trenchlessmachinery, piling machinery, mining machinery, the main products are GS series of horizontal directional driling machine, GPY series of static pile driver, GM series of surface drilling machine and accessories.
Goodeng-China Goodeng-Malaysia Goodeng-Thailand
1. What about the warranty time?
A:12 months after shipment or 2000 working hours, whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.