Customization: | Available |
---|---|
After-sales Service: | provided |
Warranty: | provided |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rig Weight | 56000 kg |
Power Station Weight | 16500kg |
Operation Room Weight | 3000kg |
Engine Power | 3×410 kW |
Max. Thrust & Pullback Force | 6700 kN |
Max. Torque | 180000 N·m |
Max. Clamp Force | 3800 kN |
Main Spindle Floating Distance | 110 mm |
Drill Rod Size | Φ140 -Φ219 mm |
Mud Pipe Channel Diameter | 4" |
Suggest Reaming Dia. | ≤ Φ2000 mm |
Rig Dimension (L×W×H) | 20400×2500×3740 mm |
Power Station Dimension (L×W×H) | 6050×2500×2600 mm |
Operation Room Dimension (L×W×H) | 6050×2500×2600 mm |
Max. Working Pressure | 35 MPa |
Max. Thrust & Pullback Speed | 40 m/min |
Max. Rotation Speed | 90 r/min |
Max Unscrewing Torque | 482000 N·m |
Entry Angle | 8° -18° |
Drill Rod length | 9600 mm |
Crane Capacity | 5 T |
Suggest Crossing Length | ≤ 2500 m |
Steel track with rubber plate attached, wire controlled walking, adjustable speed in two levels
Push pull speed adjustable in three levels (high speed, medium speed, low speed)
Large beam sliding amplitude mechanism
Reserved power boost for power head
Configure a rotating robotic arm
Optional automatic rod feeding mechanism and automatic hydraulic anchor
1. What about the warranty time?
A:12 months after shipment or 2000 working h ours,whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries.
After you receive the new machine, we will provide you one engineering training installation and debugging service for 3-5days.
If there are some problems, our after-sales service personnels will arrive the project site in shortest time.