Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects

Product Details
Customization: Available
After-sales Service: provide
Warranty: provide
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
104
Year of Establishment
2011-08-10
  • Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Certifications
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
GPY268
Type
Track
Certification
ISO 9001:2000, ISO 9001:2008
Condition
New
Transport Package
Nude Packing
Specification
mm
Trademark
Goodeng
Origin
China
Production Capacity
200/Year

Product Description

Product Parameters
Machine Weight 88T Transportation Dimensions (L×W×H) 12.2×2.7×2.89 m
Total weight of counterweight iron 91 T Working dimensions
(L×H)
12.86×5.38 m
Max. piling force 268 tf Long bridge dimensions (L×H) 11×1.1 m
Max. piling speed 8 m/min Short bridge dimensions (L×H) 4.2×2.65 m
Max. longitudinal stroke per time 2.2 m Piling stroke per time 1.6 m
Max. rotary angle per time 11° Max. horizontal stroke per time 0.5 m
Effective hoisting pile length 14 m Hydraulic system rated pressure 26(16) MPa
Max. loading pressure 12.5/12.8 tf/m² Min. side piling space 1030 mm
Piling Size Ф150-Ф500mm
F150-F400mm
Min. Corner piling space 1700 mm

 
Detailed Photos
 
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects



 
Certifications
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
 
Company Profile
 
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
                                         Goodeng-China
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
                                     Goodeng-Malaysia                                                                                             Goodeng-Thailand
Packaging & Shipping
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
Heavy-Duty Static Pile Driver GPY268 for Efficient Construction Projects
 
FAQ
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:10-20 days after receiving the deposit. 3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client. On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment? A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier