Customization: | Available |
---|---|
After-sales Service: | YES |
Warranty: | 1 year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Metric Unit | Imperial Unit | |
Weight | 9800/11400 kg | 21605/25133 lbs |
Dimension (L×W×H) | 7340×2210×2530 mm | 24×7.3×8.3 in |
Max.Thrust&Pullback Force | 367/734 KN | 82511/164922 lbf |
Max.Thrust&Pullback Speed | 36 m/min | 118 ft/min |
Max.Torque | 13000 N·m | 95886 lb·ft |
Max.Rotation Speed | 135 r/min | 135 rpm |
Engine Power | 151 kW | 202.5 hp |
Max.Flow of Mud Pump | 400 L/min | 106 gal/min |
Walking Speed | 2.5/4 km/h | 1.6/2.5 mph |
Max.Mud Pump Pressure | 8 MPa | 1160 psi |
Entry Angle | 13-23° | 13-23° |
Max.Climbing Gradient | 18° | 18° |
Drill Rod Size | φ73-φ76×3000 mm | φ2.87-φ2.99 × 118.11 in |
Drill Pipe Box Capacity | 36 pcs(4×9) | 36 pcs(4×9) |
Suggest Reaming Diameter | ≤φ1000 mm | ≤ φ39.37 in |
Suggest Crossing Length | ≤500 m | ≤ 1640 ft |
Goodeng Machine was established in 2002. The company has production bases locating in China and Thailand and 2 overseas branch offices locating in Malaysia and India, covering a total area around 200,000 square meters.
The main products include GS series horizontal directional drilling rigs, GPY series static hydraulic piling rigs, GM series open-pit surface drilling rigs and drilling tools. Annual sales exceed 3,000 units.
We have offices and professional after-sales service teams in many countries. We will provide you with engineering training, installation and commissioning services.We can aslo provide the complete solution for engineering construction.
1. What about the warranty time?
A:12 months after shipment or 2000 working hours,whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or
against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without"soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.